Building 101 · Video 4
Building 101: Water, septic, power and a driveway
What raw Hill Country land needs before a house can go on it, and why these costs surprise people.
- Length 1:55
- Captions in English
- Written summary below
Jump to a step
In writing
What this video covers
On a lot in town, water, sewer and power are usually waiting at the street. On raw land in the Hill Country, none of it is there yet. Here are the four things to plan for.
First, water. Some lots can connect to a water supplier. Others need a well. How deep a well has to go isn't known for sure until it's drilled, but nearby wells give the best clue.
Second, septic. Without a sewer line, the house needs its own septic system, and that needs a permit. Shallow soil and rock can call for a different kind of system, and that changes the cost.
Third, power. How far away is the nearest power line? Bringing power in can mean new poles or a line buried underground, and the electric provider decides part of that plan. Fourth, the driveway. A long drive up a slope may need cutting, a solid base, a culvert where water crosses, and sometimes paving. Where it meets the road may need approval, too.
These are the costs that surprise people on raw land. That's why we look at water, septic, power and the driveway on your lot, and count them in your high-low estimate from day one, not month four.
Our tip: before you buy raw land, ask how the neighbors get their water, and where the nearest power line runs.

