Building 101: What can slow a build down, and how we keep it moving
Weather and inspections, late decisions and changes, materials and money - what can slow a build, why it matters to you, and how we keep yours moving.
- Length 2:04
- Captions in English
- Written summary below
Jump to a step
In writing
What this video covers
Every build has things that can slow it down. Some no one controls. Others can be planned for. Here are the three to watch for.
First, the things no one controls. Rain can delay a slab pour or turn a lot to mud, and each inspection has to pass before the next step starts. We can't stop the rain, but we plan around it.
Second, late decisions and changes. A tile not chosen, or a wall moved after the work has started, can stop a crew in its tracks. That's why your selections are finished before you sign the final price. Changes can still happen, but each one can move the schedule as well as the price.
Third, materials and money. Some windows, doors and fixtures take a while to arrive, which is another reason to choose early. And when the lender releases draws on completed work, trades get paid promptly, and they keep showing up.
Why does this matter to you? A longer build can mean more months of rent or temporary housing. And if your loan has a rate lock, ask your lender how long it lasts.
Here's how we keep your build moving. One of us walks your jobsite every day. You get an update call every week. And if there's bad news, you hear it early, while it can still be fixed.
Our tip: make your choices early, and make them once. Want to know what could affect your build? Let's talk it through.
More Building 101 videos
Next videoBuilding 101: Moving in – the final walkthrough and your first yearTwo walkthroughs before closing (the second is also your new home orientation), closing day, and what your first year looks like - the settling that's normal, our two- and eleven-month warranty walkthroughs, and simple upkeep.Watch next All Learning Labs videos