Skip to content
Vaughn Custom Homes
All Learning Labs videos

Building 101 · Video 13

Building 101: Why the dirt is its own budget – rock, slope and trees

Limestone, a sloped lot and the trees you want to keep - why the ground has its own line in your budget, and how we balance it with what matters to you.

  • Length 1:47
  • Captions in English
  • Written summary below

Jump to a step

In writing

What this video covers

Two lots can hold the same house, and still cost very different amounts to build on. The difference is in the ground. Here are the three things we look at first.

First, the rock. Hill Country ground is mostly limestone, often just under the surface. Digging for the foundation, the septic system and the utility lines takes more time and heavier equipment in rock. That's why site work needs its own line in your budget.

Second, the slope. On a sloped lot, the foundation may need to step down the hill to keep the floor level. The higher the house sits, the better the view, and often the more concrete it takes.

Third, the trees. Sometimes an oak stands right where the house needs to go, and oaks cost more to remove. So we start by listening to what matters most to you. Then we save as many trees as we can, while keeping your views, your privacy and the best spot for your home. That includes the cedars, which are really junipers. They deserve a better reputation than they get.

Our tip: walk the lot with your builder before you choose a house plan. Want us to walk your lot with you? It's free.