In writing
What this video covers
Two bids for the same house can be far apart. The lower one looks like the easy choice. Here's why it often isn't.
First, there are two different numbers. The contract price is the number that gets your signature. The final cost is what you've actually paid by move-in day. Only the final cost matters.
Second, how a bid gets low. Site work is left out, or covered by a placeholder too small for Hill Country rock. Allowances are set too low to buy the finishes you want. Engineering, surveys and permits show up later, as extra bills. By the time the real costs appear, the slab is poured, and you're committed.
Third, what it costs you. Families who chose a lower bid came back and told us they paid more. One had to shrink the house, and lost their views, because they had to place it lower on the lot to save concrete costs. That's why we give you realistic numbers up front, including the site work, even when they look higher.
Our tip: compare final costs, not first numbers. Ask every builder what their bid leaves out.