Skip to content
Vaughn Custom Homes
All Learning Labs videos

Building 101 · Video 12

Building 101: Know your real cost before you sign

A free lot assessment, a pre-construction plan the trades can bid on, and a fixed-price contract that includes the site work.

  • Length 1:34
  • Captions in English
  • Written summary below

Jump to a step

In writing

What this video covers

How can you know what your home will really cost, before you sign a contract to build it? Here's how we do it, in three steps.

First, a free lot assessment. Before anything is signed, we walk your lot with you, and look at the rock, the slope, the trees and the way in. So the site work is planned from your real lot, not a guess.

Second, a pre-construction agreement. You get a preliminary plan of your house, complete enough for most of the trades to bid. So your numbers come from real bids, on your house, on your lot. If you build with us, the fee is credited to your build. And if you decide not to build, you keep the preliminary plans.

Third, you sign with real numbers. Your contract is fixed-price, with allowances, and it includes the site work, not a placeholder.

Our tip: before you sign with any builder, ask what the price is based on: a guess, or real bids on your plan.